-

1. Standby proposed structural wall opening, overhead lintel and plinth (optional).
-

2. Unpack and standby SLIDEHIDE casing for installation.
-

3. Anchor the SLIDEHIDE casing within the structural opening. The gaps between the track/casing and brickwall will be grouted with cement-sand.
-

4. Cement-sand render is trowelled onto the brickwall and steel casing surface. Lay fine-mesh along the grouted cement-sand to minimize plaster cracks.
-

5. After floor and wall finishes is completed, standby to fix door frame and door panel.
-

6. Installation sequence is comple- ted.
SLIDEHIDE / CAVIWALL